ELC Contractors Ltd

Environmental Landscape & Countryside

Bridges

Bridge in need of replacement

bridge replacementThis is an extreme case of bridge deterioration!Caused by flood damage. This would be replaced with a steel framed structure.

Winnall Bridge

winallbridge timber cladding

The steel subframe bridge with timber cladding is adjacent to River Severn. This replaced a collapsed culvert. Rock armour was used to stabilise the banks during high water events.

Heightington Ford

heightington ford timber bridge concrete abutmentsTypically shown here is a timber bridge with new concrete abutments and surfaced approach works, undertaken for Worcestershire County Council.

 

Recent Projects

Compton Valley

Compton Verney